Wednesday, November 6, 2013

Work on Hole 6

We were able to get 350' of drain tile installed yesterday on the left side of Hole 6. What this has accomplished is that we can now drain the holding pond at the dogleg back toward the tee area where it goes off into the woods. We will also be able to dry up the area at the beginning of the fairway that seams to hold water even on the sloped area.


This picture shows part of the area that will be drying up the beginning of the 6th fairway. Also note the green trailer that we will be using to help install the pea gravel into the trench.

Now that winter has arrived, we will continue to install tile as weather permits. There are some drier areas that we can continue on and will push onward and upward until the ground is too frozen to trench.