Saturday, August 13, 2016

Course Improvements Continue

I apologize. It's been awhile since I've updated the goings on at the course. No excuses, being too busy is part of everybody's life. We all need to put balance in our lives. It is just easier said than done.

We have completed these 9 repair projects around the clubhouse: replaced hand and deck rails on the upper deck, installed drains upstairs in the kitchen and in the Men's bathroom, purchased a new ice machine, purchased a new gas range for the upstairs kitchen ( I need to sell the old one ), corrected all of the lighting in the main clubhouse area, tiled the hallway from the bathrooms to the main area, replaced/repaired all of the outside stairs, purchased a new grille and installed a small patio on the north side of the clubhouse, and we had our parking lot crack sealed and the lower lot striped. All of these items were well needed.

Our last 2 projects are currently under way. We are installing new HVAC on the bar side of the upper level. The current unit is nearly 30 years old. We will plan to upgrade the dinning room side in the near future. The other project is adding 3 new path areas and then remove and install new asphalt to several existing paths. Taylor Paving began on Wednesday and dug in the new paths on the Driving Range Tee, 7th green, and the right on 13 green. They were also able to install the gravel base material before the heavy rains came.
This is the path extension by the green on 7.
This is the path to the right of the 13th green.
This is the wet spot at the beginning of the 2nd fairway. We hauled all of the excavation to raise the area so it will drain naturally. We will bring in some more material to shape a new green tee. Just killing 2 birds with one stone.

Stay tuned for more timely updates, I promise.

No comments:

Post a Comment